Faster, safer and proven pilings.
Faster, safer and proven pilings.
The only piling system proven to condense project schedules while making jobsites safer
The difference is measured in time, cost and safety. Traditional piling systems drag out schedules and drive up budgets and disrupt jobsites. Our system is better and faster — a truly innovative product that is going to disrupt the industry.
7 reasons YOU should choose FASTepc
You save time
Compress your project timeline. FASTepc’s pile foundations install quickly and allow immediate tower installation
You protect your budget
No hidden costs or endless change orders. What you plan for is what you’ll pay.
You need fewer people
With smaller crews and lighter equipment, you get leaner job sites that are easier to manage and safer to run.
You build to last
Your foundation won’t crack, corrode or need constant patching. FASTepc’s patented FRP piles deliver strength that holds for decades.
You get cleaner construction
Your site stays safer and there’s far less impact. No excavation, no spoil removal and no toxic coatings.
You win more bids
With faster installs and predictable costs, you can bid more competitively — and still protect your margins.
You see proof in the ground
Your results aren’t based on theory. FASTepc has delivered real projects nationwide — faster, stronger and smarter than concrete.
What these experts just saw reset the bar for foundation work.
FASTepc vs. Concrete: The Proof
FASTepc doesn’t just promise better foundations — it proves they’re better. Here’s how the revolutionary FAST pile system outperforms concrete across the board.
| Category | Traditional Concrete Piles | FASTepc Pile System |
|---|---|---|
| Installation speed | Months of construction, bottlenecks common | Rapid installation; timelines compressed to a fraction of previous requirements |
| Labor needs | 9 installers, extended periods | 3 installers, fewer human-hours |
| Equipment | 3 heavy machines | 1 heavy machine |
| Project schedule | Early delays cascade, lost time unrecoverable | Time savings ripple throughout entire build |
| Direct costs | Higher labor, equipment rental, waste | Reduced labor, minimal waste, lower install cost |
| Risk profile | 45% risk of change orders, overruns | <1% risk of change orders, overruns. |
| Durability | Susceptible to corrosion, uneven performance | Corrosion-resistant FRP, patented piles last 100 years |
| Life cycle cost | High maintenance, ROI erodes | Lower maintenance, stronger long-term ROI |
| Contractor edge | Higher cost, longer timelines reduce competitiveness | Faster, cheaper, more-reliable bids |
| Sustainability | Inefficient, higher carbon footprint | Fewer materials, smaller footprint, cleaner builds |
Project Example
Sample Project: 500kv H Frames | Soil: Organic matter, peat, sand, water | 90° temps, 100% humidity | Wildlife preservation required
Result: FASTepc cut $6MM in costs, delivered the job five months faster, and required 67% fewer crew members.
Projects don’t need to take six months, 9 workers and millions in overruns. FASTepc proves there’s a better way.
FASTepc Push Pile System
- $34MM
- Duration: 1 month
- Crew: 3 installers
- Heavy equipment: 1
- Amphibious equipment: 2
- Fast pile: 7’ × 37’
Traditional Concrete Pile
- $40MM
- Duration: 6 months
- Crew: 9 installers
- Heavy equipment: 3
- Amphibious equipment: 3
- Drilled caisson: 6’ × 40’
Advantages concrete can’t match
Innovation engineered for modern infrastructure saves time, cost and risk.
Time-lapse shows the speed, precision and reliability of FRP pilings being set
Watch FASTepc drive this piling
in just 15 minutes
This time-lapse captures the full installation of a FASTepc piling — start to finish in only 15 minutes. No excavation, no curing delays, no spoil removal. Just clean, rapid installation with immediate load-bearing capacity. FASTepc’s fiber-reinforced polymer foundation system delivers stronger, safer and faster results that redefine how modern foundations are built.
This installation was done in Green Cove Springs, Florida. The piling was 35 feet, and that’s our ABI Mobilram doing the heavy lifting.
FASTepc: Delivering environmental benefits for everyone
Technical answers to the questions you’re asking