89%
Faster installation
67%
Fewer crew members
79%
Shorter project timeline
15%
Project cost savings
Why are FASTepc installations faster than drilled concrete caissons?
Concrete caissons require excavation, spoil removal, curing time and protective coatings. FASTepc’s patented piles are driven directly into the soil without excavation. No curing means the superstructure can be set immediately, compressing timelines from months to weeks.
Advantages concrete can’t match
Innovation engineered for modern infrastructure saves time, cost and risk.
Time-lapse shows the speed, precision and reliability of FRP pilings being set
Watch FASTepc drive this piling
in just 15 minutes
This time-lapse captures the full installation of a FASTepc piling — start to finish in only 15 minutes. No excavation, no curing delays, no spoil removal. Just clean, rapid installation with immediate load-bearing capacity. FASTepc’s fiber-reinforced polymer foundation system delivers stronger, safer and faster results that redefine how modern foundations are built.
This installation was done in Green Cove Springs, Florida. The piling was 35 feet, and that’s our ABI Mobilram doing the heavy lifting.
Technical answers to the questions you’re asking






